Case Studies
Live Manufacturing Facility - Clean Environment
Major Pharmaceutical Company - Live Laboratory Environment
Leading Pharmceutical Company, Tonbridge
Network Rail, The Mailbox, Birmingham
Live Manufacturing Facility - Clean Environment
In October 2007 a major Pharmaceutical Manufacturing Company awarded Ponte Comm the very prestigious Cat6 data cabling of four of their live production buildings. These ranged from a Victorian style warehouse to a typical purpose built manufacturing unit.
Ponte Comm has great experience of working in live environments, however this was a 24/7 production plant. An example of the sensitivity of this working environment, one building is dedicated to the production of asthma inhalers. Adhering to the very strict procedures on site to protect the manufacturing process was non-negotiable.
![]() |
Client Requirements: |
Planning
With our dedicated team of containment specialists, we spent approximately 3 weeks surveying the site and were successful in finding routes that had not been thought possible before, allowing minimal containment within the production area. We had an initial deadline from the customer of completion in 8 months. With the project started, this deadline was moved forward by 11 weeks giving less than a 6-month deadline.
Delivery
| As a failsafe, throughout the production facilities a resilient system was installed, with 50% of outlets cabled to one comms room, and 50% to another. No production facilities were disrupted during any of our works. As Principal Contractor Ponte Comm was responsible for the installation of all containment systems and associated builders work openings. We produced O&M Manuals for each building including full test results, CAD drawings, cabinet layouts, ADC Krone warranty. | ![]() |
Success
Ponte Comm delivered the project WITHIN the reduced timescale and 18% UNDER BUDGET, due to:
|
|
![]() |
The responsible Client project manager stated at the end of the project: "Your staff are excellent - a very well delivered project."
Major Pharmaceutical Company - Live Laboratory Environment
In 2007 we were awarded a contract to install the Cat6 in a typical 1980's building over 4 floors consisting of a mixture of live laboratories, write-up areas and administration areas.
|
|
Client Requirements:
|
Delivery
The project was specified to a new structured cabling system utilising ADC Krone TrueNet UTP LSF Category 6 cabling and components throughout.
|
Cabling to laboratory areas was via ceiling mounted high band 12-way consolidation boxes, fully populated to future-proof them for additional cabling requirements. Secondary connections to the user ports were completed on like-for-like basis. The laboratories and write-up areas works were completed in phases. With careful planning and close liaison with the customer and users, no disruption was incurred by the ongoing research projects. |
![]() |
As Principal Contractor Ponte Comm was responsible for the installation of all containment systems and formation of new Builder's work openings associated with the containment. Thorough planning and temporary re-location of existing data cabling enabled much of the existing containment system to be re-used with modifications to allow for the refurbished room layout.
Success
In the original tender the project was to be phased over a 12-month period due to the access restrictions with end users. The deadline was reduced by 3-months, giving an 8-month timescale. Ponte Comm delivered the project WITHIN this reduced timescale.
Due to the effective planning and efficient site management on the ground, the site knowledge of our supervisors and the planned migration work each weekend, the project was delivered within the 8 months deadline.
In addition, our careful re-use of the existing containment system, Ponte Comm saved the customer a considerable amount - approximately 15% of the overall project cost.
This saving allowed for a significant number of extra outlets adding during the course of the project to be paid for under the original contract sum.
Network Rail: Manchester Square One Infrastructure Works
|
Network Rail Corporate (NWR) acquired a prestigious new office building in Manchester, Square One, located near Piccadilly Station. The new accommodation is 65,000sq feet and the project consisted of cabling the Ground, 1st and 2nd floors.
Ponte Comm was the cabling contractor working for Overbury the fit-out contractor. We completed the design, installation, termination and testing of the ADC Krone Category 6 cabling system, along with fibre optic and voice backbones. |
Clients Requirements
-
Category 6 connections for 878 workstations were provided across three floors
-
Each workstation consisting of 4 x ADC Krone Cat 6 outlets
-
All outlets terminated within each desk
-
Additional outlets in each Meeting Room and the Office Serve Centre
-
Project consisted of approximately 4,000 outlets
Delivery
We fully installed a Comms Room on each of the floors to house the live and passive network equipment. These were linked to the Main Comms Room via optical fibre and voice cabling backbones, all provided, installed, terminated and tested by Ponte Comm engineers.
SuccessIn facing the many onsite issues during the planning stage, Ponte Comm was able to quickly and effectively manage each situation to provide a positive solution. |
![]() |
Ponte Comm continues to be an installer of choice for Network Rail.
Read about Network Rail's Manchester Square One award winning offices.
Large Pharmaceutical Company: Tonbridge Site-wide Upgrade Project
A leading pharmaceutical company commissioned a full site upgrade of their Tonbridge site to Krone Cat 6 over a 7 month period, with all 7 main and several smaller older-style buildings all to be included.
|
|
As Main Contractor Ponte Comm project managed all the services onsite, including sub-contract electrical, air-conditioning and building works.
A new containment system was installed throughout to accommodate the new Cat 6 data cabling system. In addition, Ponte Comm's in-house fibre specialists provided internal and external, singlemode and multimode optical fibre links. |
Adding value, Ponte Comm recommended and offered technical advice on the use of wireless technology onsite.
We then completed a wireless survey, submitted a report and recommendations and installed the wireless Access Points and an Intrusion Detection System.
Success
Strong project management onsite and support from the office-based team, together with good cooperation and communication with all parties resulted in a very successful project being completed to the full satisfaction of the customer.
Network Rail: The Mailbox, Birmingham
| Ponte Comm recently worked with Network Rail on a Fast Track project in the prestigious Mailbox building in Birmingham.
With the objective of consolidating regionally-based staff in a central location, Network Rail completely refurbished offices on the seventh floor of The Mailbox. A bold futuristic design scheme encompassed all aspects of the open-plan space and mezzanine floor, including specially designed furniture with purpose-built integral flat screen mounts. |
|
We installed a bay of four full size cabinets into the Comms Room to accommodate Cat 6 patching (2 x central cabinets), voice patching (1 x outer cabinet) and active equipment (1 x outlet cabinet).
With all services onsite working closely to ensure the timetable was met, the Fast Track project was successfully completed to deadline.
To discuss your data cabling needs or for a free, no-obligation quotation please call 01276 63773 or This e-mail address is being protected from spam bots, you need JavaScript enabled to view it .
Featured Project
Cat6 Structured Cabling Systems - Live Manufacturing Facility-Clean Environment
Read more...Latest News
Fitting tribute was paid to Network Rail's Square One building in Manchester when it won the British Council of Offices award for best office fit-out in the north of England, north Wales and Northern Ireland on 2 July. As a result, it is now short-listed for the UK award, which will be announced in October.