Barkers HR Advertising: London
|
When Barkers HR Advertising first contacted Ponte Comm, it's fair to say their data cabling system needed some attention. We completed a Network Audit inspection and report on the whole system from top (8th floor) to bottom (Basement). |
The Barkers IT team welcomed the report and commissioned Ponte Comm to fully implement our recommended course of actions.
![]() |
This started at the hub of the network with a full re-organisation of the Main Comms Room. This included verification of the patching scheme by tracing and documenting each patch lead from end to end. Patching was re-orangised, with obsolete leads being removed and the many inappropriately long leads replaced with leads of suitable length. The result was spectacular, we had delivered an organised and professional IT environment. Works continued with a complete overhaul of the optical fibre backbone cabling system, including the riser containment system. We also installed a new Cat 5e horizontal cabling system. |
Our relationship with Barkers continues to develop, with Ponte Comm now the first port of call for data needs. Indeed, when another service contractor recently cut through a fibre optic cable onsite, Ponte Comm received an emergency call. Our engineers attended site and the fault was fixed within 24 hours.
To discuss an Infrastructure Health Check on your network cabling or for a free, no-obligation quotation please call 01276 63773 or This e-mail address is being protected from spam bots, you need JavaScript enabled to view it .
Featured Project
Cat6 Structured Cabling Systems - Live Manufacturing Facility-Clean Environment
Read more...Latest News
Fitting tribute was paid to Network Rail's Square One building in Manchester when it won the British Council of Offices award for best office fit-out in the north of England, north Wales and Northern Ireland on 2 July. As a result, it is now short-listed for the UK award, which will be announced in October.