Remote working via wireless  

Case Studies

Ernst & Young: London and Birmingham  

Capital One Bank, Nottingham


Ernst & Young: London and Birmingham 

In an office environment full of mobile professionals, contact and accessibility to information is essential to the day-to-day working life. Ernst & Young therefore considered the introduction of a wireless network into their prestigious new offices in London and Birmingham.  

 Ernst & Young logo

Ponte Comm were called upon to provide their specialist, Cisco-trained engineering team to complete the initial wireless radio survey, report findings and recommendations, and complete the installation of the wireless equipment.

Ernst & Young, London  

Ponte Comm's remit was as follows:

  • Highlight any issues preventing or restricting the use of wireless in any given location
  • Suggest workarounds where possible
  • Conduct the Wireless Survey where appropriate

The survey report was backed up with:

  • Technical details
  • Full analysis of survey findings, including coverage diagrams
  • Marked up CAD drawings and
  • Digital photographs indicating AP and IDS locations.

Following our survey, Ernst & Young accepted our recommendations, resulting in the successful installation of wireless LAN networks into three buildings, amounting to over 170 Access Points.

Back to top


Capital One Bank, Nottingham

Capital One Bank wished to introduce a wireless network designed to primarily support the use of 7,920 wireless phones within their two buildings in Nottingham.  

Ponte Comm was commissioned by Kingston Communications to provide a comprehensive wireless survey report, including 'cell planning' and installation guide, to support a site wide wireless IP telephone infrastructure incorporating Cisco technology.

Our task was to ensure that high quality voice communication was available in 100% of the buildings.  Capital One Bank required this level of service in support of all of the banks functions including security and emergency services.

The client's premises consist of two adjacent buildings that are linked at several levels via covered walkways, and is used as a call centre and technical support environment.

One building is a new glass-clad building and purpose built for the client, consisting of an open plan block over 5 floors with central atrium. This environment is ideal for a wireless network .

 Capital One, Nottingham

The second building is a Grade 1 listed stone-clad textile mill, over three floors and with very high ceilings. This building presented us with a series of technical challenges in designing the WLAN to ensure the client the level of service needed.

As an example of the complexity of the proposal, our team of engineers encountered: three-foot thick masonry walls, Victorian cast iron pillars and beams, a fully functioning 11KVA electrical transformer house in the basement, a warren of interlinking basement passageways, a vast glazed multi floored atrium complete with flying bridge walkways and numerous elevators. 

Capital One, Nottingham 

A dual band network was required to allow all users uninterrupted telephone conversations even when moving around the building.  We utilised the 802.11a and 802.11g frequencies for this project.

 

The 6 weeks project was completed successfully on time and to budget.

The Bank achieved 100% success in its desired system capability and coverage, including atrium, covered walkways and stairwells. 

This has allowed the Bank's personnel to maintain productivity whilst benefitting from the freedom to roam.


To discuss your wireless technology needs or to arrange a specialist wireless survey please call 01276 63773 or email us

Back to Top

 
Featured Project


Network Rail's new headquarters is located in the prestigious King's Place building, near to King's Cross Station in London.

Designed by celebrated architects Dixon-Jones, Kings Place brings together under one roof a creative hub, a dining venue, a conference and events centre, and office complex. 

 Ponte Comm's brief was to complete a full structured cabling upgrade of the 4th and 6th floors.

Read more...

Latest News
We are delighted to have been selected as Approved Data Cabling Installers for two of the top universities in England: Durham University and London Metropolitan University.  
 Authorised Data Cabling Installer for Durham University Authorised Data Cabling Installer for London Metrolpolitan University
 
approved installers for:

ADC Krone TrueNet Authorised Integrator 

Excel Cabling Partner 

HellermannTyton System Installer

Molex Premise Networks

Siemon Certified Installer 

Approved Accreditations
ISO9001:2000 CITB Construction Skills BuildingConfidence Logo BICSI Corporate Member OHSAS 18001  Fiberoptic Industry Association HSE Be Part of the Solution